Project Gutenberg #54475
Discoveries and Inventions of the Nineteenth Century
Robert Routledge
1900Routledge's illustrated survey of nineteenth-century engineering and invention, prepared chapter by chapter from Project Gutenberg HTML.
Project Gutenberg #54475 Public domain in the United States Cover source Local typographic cover created for MojiMori from public-domain source metadata
17
words at B2 or above
A1
A2
B1
B2
C1
C2
C2+
highlighted
at or above your level
Missing dictionary data: 1 unique word is not in the dictionary data yet. Amber marks show where it appears.
purpose.
The reader may be interested in learning what is the cost of “prospecting” with this unique machinery. The company usually undertake to bore the first 100 ft. for £40, but the next 100 ft. cost £80–-that is, for 200 ft. £120 would be charged; the third 100 ft. would cost £120–-that is to say, the first 300 ft. would cost £240, and so on—each lower 100 ft. costing £40 more than the 100 ft. above it. Some of the holes bored have been of very great depth, and have been executed in a marvellously short space of time. Thus, in 54 days, a depth of 902 ft. was reached at Girrick in a boring for ironstone; another for coal at Beeston reached 1,008 ft.; and at Walluff in Sweden 304½ ft. were put down in one week!
These machines are peculiarly suitable for submarine boring, for they work as well under water as in the air; and they will no doubt be put into requisition in the preliminary experiments about to be made for that great project which bids fair to become a sober fact—the Channel Tunnel between England and France; and as, by the time these pages will be before the public, the work of the greatest and boldest rock-boring yet attempted will have commenced, and the scheme itself will be the theme of every tongue, the Author feels that the present article would be incomplete without some particulars of the great enterprise. [1875.]